Zerust Oil & Gas completes hundreds of field projects annually. Please take a look at a collection of our completed field projects and client application case studies demonstrating our experience and expertise of corrosion mitigation in the oil and gas industry.
Tanks and Terminals
- Corrosion Protection for a Single Bottom Storage Tank on Bitsand Foundation via Chime Ring Dry IDS December 2020
- Corrosion Protection for a Single Bottom Storage Tank on Rocky Gravel Foundation via Internal Flood IDS November 2020
- Corrosion Protection for a Single Bottom Storage Tank on Pea Gravel Foundation via Internal Flood IDS September 2020
- Corrosion Protection for a Single Bottom Storage Tank on Bitsand Foundation via Chime Ring Dry IDS for Shell Aviation (UK) at the London Luton Airport August 2020
- Corrosion Protection for a Single Bottom Storage Tank on Concrete Foundation via Chime Ring Dry and Dry Tube IDS July 2020
- Corrosion Protection for 2 Out-of-Service, Single Bottom, Storage Tanks on Sand Foundation via Internal Flood IDS July 2020
- Corrosion Protection for 2 Out-of-Service, Double Bottom, Storage Tanks on Sand Foundation via Underside Injection IDS July 2020
- Corrosion Protection for 3 In-Service, Single Bottom, Auto Fuel Storage Tanks on Sand Foundation via Underside Injection IDS June 2020
- Corrosion Protection for 3 Single Bottom Storage Tanks on Sand Foundation via Internal Flood and Underside Injection IDS May 2020
- Corrosion Protection for 2 Out-of-Service, Double Bottom Storage Tanks on Sand/Gravel Foundation via Underside Injection IDS May 2020
- Corrosion Protection for an Under Repair Out-of-Service Storage Tank by Drip Tube and Underside Injection IDS April 2020
- Corrosion Protection of Out-of-Service Crude Oil Storage Tank on Sand Foundation by Internal Flood and Underside Injection IDS February 2020
- Corrosion Protection for Out-of-Service Storage Tank on Sand/Soil Foundation by Internal Flood IDS February 2020
- Corrosion Protection of In-Service Diesel Tank SSB with Underside Injection February 2020
- Corrosion Protection for an In-Service Crude Oil Storage Tank on Concrete Foundation by Chime Ring Dry IDS December 2019
- Corrosion Protection for an Out-of-Service Crude Oil Storage Tank on Sand Foundation by Underside Injection IDS December 2019
- Corrosion Protection for an Out-of-Service Diesel Storage Tank on Concrete Foundation by Underside Injection and Dry Tube IDS November 2019
- Corrosion Protection of an Aboveground Storage Tank on Limestone/Coral Foundation by Internal Flood IDS October 2019
- Corrosion Protection of an Out-of-Service Crude Oil Aboveground Storage Tank on Bit-Sand Foundation by Chime Ring Dry IDS with ER Probes September 2019
- Corrosion Protection for an In-Service Benzene Storage Tank on Compacted Sand/Soil Foundation by Underside Injection September 2019
- Corrosion Protection for a Diesel Out-of-Service Storage Tank with Liner, CP System, and Concrete Ring Wall on Sand/Soil by Underside Injection July 2019
- Corrosion Protection for an Out-of-Service Diesel Oil Fuel Storage Tank by Underside Injection and Dry Tube IDS July 2019
- Corrosion Protection for Seven In-Service Ethanol/Methanol Storage Tanks by Underside Injection / Chime Ring Dry IDS July 2019
- Corrosion Protection for an In-Service Diesel Storage Tank on Sand/Soil Foundation with CP System by Underside Injection June 2019
- Corrosion Protection for an In-Service Gasoline Storage Tank with Liner on Sand/Soil Foundation by Underside Injection May 2019
- Corrosion Protection for an Empty Out-of-Service Storage Tank on Concrete Foundation by Underside Injection March 2019
- Corrosion Protection for (3) Out-of-Service Storage Tanks on New Compacted, Fill Sand via Drip Tube IDS February 2019
- Corrosion Protection for an Out-of-Service Petroleum Storage Tank on Concrete Foundation by Underside Injection January 2019
- AST SSB IDS Internal Flood January 2018
- AST SSB IDS with ER Probe Corrosion Monitoring March 2018
- AST SSB IDS Underside Injection with ER Probe March 2018
- AST SSB IDS Chime Ring Injection March 2018
- AST SSB IDS Chime Ring Dry and ER Probe Analysis March 2018
- Tank Underside Injection with ER Probe Monitoring July 2018
- Tank Internal Flood Inhibitor Delivery System July 2018
- Tank Underside Injection IDS July 2018
- In-Service Tank Underside Injection IDS November 2018
- Corrosion Protection of In-Service Vegetable Oil Storage Tank December 2018
- Tank ER Probe Installation for Corrosion Monitoring January 2017
- AST SSB IDS Chime Ring Dry February 2017
- AST Follow Up on Bottom Protection Using Chime Ring Dry System February 2017
- AST SSB IDS Underside Injection April 2017
- AST SSB IDS Underside Injection with ER Probe Monitoring June 2017
- Tank Rooftop Protection with ER Probe Installation December 2017
- AST SSB IDS with Inhibitor Flood Injection August 2016
- AST SSB IDS Chime Ring Dry Installation August 2016
- UST Inhibitor Injection and Sleeve Installation September 2016
- Tank Roof Protection April 2015
- AST SSB IDS Dry Tube Client Application April 2015
- AST SSB IDS Underside Drip Tube April 2015
Pipelines
- Corrosion Inhibitor Solution into Pipeline Manifold for Corrosion Protection March 2021
- Pipe Casing Injection for Corrosion Protection of 6 Casings using Zerion® FVS Corrosion Inhibitor Powder & Gel November 2020
- Pipe Casing Injection for Corrosion Protection of 6 Casings using Zerion® FVS Corrosion Inhibitor Powder & Gel August 2020
- Pipe Casing Protection for Casing in Florida August 2020
- Pipe Casing Protection for Casing Crossing State Highway August 2020
- Pipe Casing Injection for Corrosion Protection of Pipeline Carrying Carbon Dioxide June 2020
- Pipe Casing Injection for Corrosion Protection of Mechanically Shorted Cased Crossing May 2020
- UK Shorted Excavated Pipe Casing November 2019
- Pipe Casing Injection for Petroleum Pipeline March 2019
- Pipeline Preservation for Out-of-Service Pipelines May 2019
- ER Probe Monitoring for Pipe Casings June 2018
- Pipe Casing Corrosion Inhibitor Injection July 2018
- Pipe Casing Injection October 2018
- Pipe Casing Injection of Crude Oil Pipeline November 2018
- Protection of Natural Gas Pipeline December 2018
- Pipeline Layup Preservation December 2017
- Pipeline Casing Protection April 2016
- Railroad Pipe Casings June 2016
- Shorted Pipe Casings November 2014
Flange Protection
Miscellaneous
- Electrical Cabinets April 2015
- Turbine Preservation May 2015
- Heat Exchanger May 2015
- Mothballing Spare Parts - Wet Gas Compressor June 2014