Client Application: SSB Chime Ring – Dry

Problem

Soil Side Bottom (SSB) corrosion of a tank that is in or out of service and has a concrete, bitumen, compacted sand or soil foundation.

Details

  • Concrete pad tank foundation
  • Chime preparation and sealing with visco-elastic sealants
  • Inhibitor delivery pipelines being installed and sealed
  • l-1
  • l-1
  • l-1
  • l-1
  • l-1
  • l-1
  • l-1
  • l-1
  • l-1
  • l-1
  • l-1
  • l-1

Details Cont.

  • Inhibitor “ring” around the chime sealed and ready for dry powder inhibitor introduction.
  • Zerion FVS – S-10 dry inhibitor sleeves being pulled through the chime ring
  • System sealed with inhibitor inside; sleeves to be replaced after ~2 years